logo
NEWS CENTER
Professional manufacturing with excellent quality
classification

Luxury with technology! Internal view of the world's first "3D prefabricated villa"

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2020-02-23
  • Views:0

(Summary description)When it comes to "villas", we are not new to each other, but villas made with the technology of "3D printing houses" will surely attract the "eyeballs" of many friends!

Luxury with technology! Internal view of the world's first "3D prefabricated villa"

(Summary description)When it comes to "villas", we are not new to each other, but villas made with the technology of "3D printing houses" will surely attract the "eyeballs" of many friends!

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2020-02-23
  • Views:0
Information
When it comes to "villas", we are not new to each other, but villas made with the technology of "3D printing houses" will surely attract the "eyeballs" of many friends!
Recently, the world's first "3D prefabricated villa" was officially unveiled in Songzhuang Art District, Beijing. This villa, which is built with "3D printing house" technology as the main production process and "modular assembly" technology, has become the focus of many media during the construction process. Today, Xiaobian is honored to enter this villa of "technology highlights luxury" and share the artistic beauty of future architecture with you!
 
First, let's take a picture of the villa's exterior (the garden bridge in the picture is also the result of "3D architectural printing").
 
This villa is "the first enterprise in the world to realize the" commercialization "of 3D architectural printing" - launched by Beijing Huashang Luhai Technology Co., Ltd. What we need to "knock on the blackboard" here is that Chinese land and sea is the only enterprise in the world that can produce "large particle heavy aggregate concrete" sprayer and realize the raw material of "steel bar + large particle heavy aggregate concrete". Before that, its 3D on-site printing Villa - "New Windsor Castle" was rated as one of the "seven largest 3D buildings in the world" by a number of well-known media around the world.
So, what's the difference between this "3D assembled" villa and the "New Windsor Castle" launched by Chinese businessmen before land and sea? Next, let's understand the difference between "3D on-site overall printing" and "3D assembled building" through several construction drawings.
 
 
First of all, let's learn about "3D on-site overall printing". This 3D building printing method is to print the whole building through large-scale 3D printing equipment on the site of the building.
 
 
The original "3D assembly building" of Chinese land and sea companies is customized printing of "single building" in the factory, and then to the construction site for construction. This kind of "single building" produced by "3D building printing" technology adopts the construction concept of "building horizontally and using vertically" in the printing process. Therefore, it is not only more in line with human living habits, but also very superior in the structural strength of the building.
 
 
This "3D prefabricated villa" is assembled by using 10 "single buildings". In the process of assembly, each "single building" weighing several tons or even more than ten tons only needs four lifting points to complete all the lifting work, and the structural stability of the building is very excellent.
In addition, this kind of "assembly mode" with "single building" as the module not only solves the problems of traditional "assembly building" such as wall cracking, uneven plate splicing gap, poor sound insulation effect, poor heat insulation effect, but also provides a "self reorganization" high intelligent living space for residents.
 
In terms of raw materials for villa construction, Chinese businessmen, land and sea, have used their unique "ordinary grade reinforced concrete" as "printing ink". Therefore, no matter the appearance or the living adaptability of the whole villa, it is not much different from the houses we live in at present.
Next, we will walk into the beautiful space of this future building
 
 
Enter this "3D prefabricated villa", first of all, the living room part. At the top of the living room, we can see two arc-shaped decorative light strips, which is the "single building" foundation frame we saw before.
 
 
The whole villa is not very different from the house we live in at present in terms of senses, but because it is assembled by "single building", the interior walls should be considered as "load-bearing walls". However, if you live in this kind of house in the future, you don't need to "tear down the walls and make holes" in the decoration, because this "3D prefabricated villa" can customize the house pattern according to your requirements, and all you need to do is "soft decoration".
 
 
The kitchen of the villa, in this picture, we can see that the upper left corner of the wall has an arc, which is the biggest feature of "3D building".
 
 
The lower left corner of the bathroom wall also has a slight arc In addition, it is basically the same as the house we live in now.
 
 
In terms of construction period, the overall assembly work of this villa with an area of more than 200 square meters can be completed in only three days, and the production cycle of "single building" in the factory is only about one week. Therefore, this kind of "3D assembly villa" will save more than 60% of the construction period compared with our current construction method.
 
In addition, during the whole assembly process, only 3-4 workers are needed to complete all the work, and more than 50% of the personnel cost will be saved.
 
 
Speaking of this, many friends would like to ask, if you want to own this kind of "3D prefabricated villa", which is not only time-saving, but also very solid, how much money does it cost? According to the introduction of the technicians of Chinese businessmen, land and sea, the construction cost of this villa is not too different from the current traditional "pouring" construction method, so most of the property owners are still able to accept it .
 
 
In terms of market prospect, this kind of "3D prefabricated villa" with super IP value and high cost performance is expected to become a new building mode in the fields of new rural construction, cultural and tourism characteristic town, tourism homestay, etc.
 
At present, based on the technology, Chinese merchants, land and sea, have launched a "joint partner" plan across the country. Therefore, whether you want to own your own villa or join in this high-tech construction industry, you can contact "Chinese businessmen on land and sea", I believe that you will be satisfied!

Scan the QR code to read on your phone

底部logo

Founded in 1989, Beijing Huashang Luhai Technology Co., Ltd. is located in Fuhao Industrial Development Zone, Tongzhou District, Beijing, covering an area of about 18000 square meters. Relying on the correct business strategy and scientific management of the enterprise,
Chinese merchants are growing and growing. They have achieved their goals year by year with a steady style. Since 2003, they have been appraised as
"Shouxin enterprise" is one of the powerful enterprises in the same industry.

Address: No.101, Regal Industrial Zone, Songzhuang Town, Tongzhou District, Beijing

Hotline:010-89551719